A shower that leaks within five years
Tile and grout are not waterproof. Every shower we build sits on a bonded membrane system and is flood-tested for 24 hours before a single tile goes on the wall.
Bathroom services · Licensed & insured
Full remodels, primary suites, small baths, new bathrooms, tub conversions and walk-in showers, each run by one supervisor under one contract. The services below show typical prices and how long the bathroom is out of use, so you can start with the right one.
Not sure which service fits? Text a photo of the bathroom and a supervisor points you to the right one within 5 minutes during business hours.
Why bathrooms go wrong
A bathroom can look finished and still be built to fail: a shower with no real waterproofing, a fan that vents into the attic, a floor that was soft before the new tile went down. We price the parts you cannot see.
Tile and grout are not waterproof. Every shower we build sits on a bonded membrane system and is flood-tested for 24 hours before a single tile goes on the wall.
If it is your only bathroom, the schedule is planned so a toilet works every night, and tub conversions are done in days, not the weeks a full remodel takes.
Leaks around old toilets and tubs rot the subfloor. We check it from below before pricing, and replace the soft section so the new tile never cracks over it.
Bathroom services we build
Pick the one closest to your plan. Each page lists the three price tiers, the materials by brand, the week-by-week schedule and what we usually find once the old tile comes off.
Refresh, full gut or new layout for a hall or family bath, each tier priced with what it includes and how long it takes.
The suite off your bedroom: double vanity, larger shower, soaking tub and heated floor, priced in three levels of finish.
Bathrooms under 45 square feet, redesigned inch by inch so the door, the toilet and the shower stop fighting for room.
A new bathroom where there was none: carved from a closet, converted from a room or built out on a new foundation.
The old tub comes out and a shower goes in its 60 by 30 space, with a panel, tiled or low-threshold build.
A tiled walk-in shower built on a tested waterproofing system, with a low curb or none at all and frameless glass.
Not sure which one you need
Most people know what annoys them about the bathroom, not what the job is called. Find the line that sounds like yours; the supervisor confirms it at the visit.
Ask a supervisor which service fits| If you want to | Start with |
|---|---|
| Redo a worn hall or family bathroom from top to bottom | Bathroom remodeling |
| Give the bath off your bedroom two sinks and a big shower | Primary bathroom remodel |
| Make a cramped 5 by 8 bathroom work better | Small bathroom remodel |
| Get a second bathroom where the house has none | Bathroom addition |
| Stop stepping over the tub wall to shower | Tub to shower conversion |
| Build a large tiled shower with little or no step | Walk-in shower installation |
Bathroom costs at a glance
Typical totals with mid-range tile and fixtures at current labor rates. Your written estimate itemizes the same lines, so you can hold it next to any other quote.
| Service | Typical range | Typical time |
|---|---|---|
| Bathroom remodeling | $12k–$80k+ | 2 to 8 weeks |
| Primary bathroom remodel | $30k–$160k+ | 5 to 12 weeks |
| Small bathroom remodel | $9k–$48k | 2 to 6 weeks |
| Bathroom addition | $25k–$175k+ | 4 to 16 weeks |
| Tub to shower conversion | $8k–$34k | 3 days to 3 weeks |
| Walk-in shower installation | $12k–$55k | 2 to 5 weeks |
Ranges include labor, materials, waterproofing, permits and disposal; the written estimate after the visit replaces them with a fixed price for your bathroom.
Bathrooms before and after




How a bathroom project runs
The same four steps whether we are converting one tub or building a bathroom that did not exist.
Step 01
On-site visit, scope review, honest repair-or-replace opinion. No pressure, no decision needed that day.
Step 02
Itemized quote with Good, Better and Best options, a declared contingency and a dated schedule.
Step 03
We pull permits, schedule inspections and send you a room-by-room prep checklist.
Step 04
Daily updates, clean site every evening, final walkthrough and a written warranty in your hand.
Written into every contract
The approved price is the final price. Change orders only with your written approval.
A credit for every working day of delay we cause. Weather and inspections excepted, in writing.
Dust barriers, floor protection and a clean-up before we leave. Your home stays livable.
A text or email every working day with photos and tomorrow's plan, or the day is free.
Workmanship warranty in writing, transferable to the next owner, backed by a fixed address.
A small deposit, then you pay only for work that is already completed, inspected and photographed.
Other bathroom work we quote
Vanities, heated floors, fans, glass doors and similar jobs are done by the same bathroom crews and listed in your estimate, so one contractor handles the whole room.
Bathroom questions
Replace only the tub with a shower if the floor is firm, the vanity and toilet work, and the room is laid out the way you like; that takes days. If the floor is soft, the tile is loose or the pipes are old, a full remodel is the better use of the money.
A conversion builds a shower inside the old 60 by 30 inch tub space in days. A walk-in shower installation can be larger, curbless or in a new spot, with framing work under the floor, and takes two to five weeks.
Yes. A primary suite is usually bigger and planned for two people, with a double vanity, a larger shower, often a tub and a heated floor. It costs more and takes longer, so it has its own page and its own price tiers.
Rarely. Most codes allow a full bath of about 5 by 7 feet. Pocket doors, wall-hung toilets, shallow vanities and glass panels make small rooms work, and we cover those choices on the small bathroom page.
Remodeling an existing bathroom costs far less, because the drain, vent and water lines are already there. Adding a bathroom starts around $25,000 for a half bath in a closet and rises with the distance to the nearest drain.
A panel tub to shower conversion, usually three to five working days. A tiled conversion takes about ten working days, a full hall bath remodel three to five weeks, and a primary suite six to nine.
Bathroom crews near you
Bathroom crews live and work in your area and build under the contractor license of your state. The numbers are posted state by state on our licenses page.
Free bathroom estimate
Pick the service and a bathroom supervisor texts back within 5 minutes during business hours to set a visit time that suits you.