Flashing skipped at the windows
Water that gets behind siding has to be steered back out by tape and flashing at every opening. We list each flashing step on the estimate and photograph it before any panel covers it.
Siding and exterior · Licensed & insured
New siding on an addition, a tear-off of failing boards, vinyl, fiber cement, James Hardie or the whole outside of the house. Each service below shows its usual price and timeline, so you know which one fits before a supervisor walks your walls.
Text two street photos of the house. A licensed exterior supervisor reads them and names the service that fits, usually within 5 minutes on a business day.
Why siding jobs go wrong
Siding is the part you see, but leaks, rot and voided warranties come from what sits behind it and the order the work is done in. These three mistakes cause most of the calls we get about other contractors' jobs.
Water that gets behind siding has to be steered back out by tape and flashing at every opening. We list each flashing step on the estimate and photograph it before any panel covers it.
Soft boards on one wall do not always mean new siding for the whole house. We probe and meter every wall and put a repair price next to the replacement price, in writing.
Makers like James Hardie and CertainTeed only honor warranties when their instructions are followed. We install each product to its own rules and keep photos of clearances and nailing.
Siding and exterior services we build
Pick the service nearest to what your walls need. Every page lists price tiers, named products, the problems we most often uncover behind old siding and a dated week-by-week plan.
New siding on a new build, an addition or bare sheathing, with housewrap, flashing and trim detailed before any panel goes up.
Tear-off of failing siding, repair of the rot found underneath and a new wall system, with an honest repair-or-replace call first.
Vinyl siding by gauge and brand, from standard panels to insulated vinyl, hung loose so it moves with the heat and never buckles.
Heavy, fire-resistant fiber cement from several makers, cut with dust control and finished on site or at the factory.
HardiePlank, HardieShingle and ColorPlus finishes installed to the maker's written instructions, so the product warranty holds.
Siding, windows, trim, doors, porch and paint planned as one project, one design and one schedule for the whole outside.
Not sure which one you need
Homeowners describe siding by what they see: soft boards, faded panels, a bare addition. Pick the line that matches your walls, and the supervisor checks it on site.
Ask a supervisor which one fits| If you want to | Start with |
|---|---|
| Side a new addition, garage or walls stripped to sheathing | Siding installation |
| Deal with siding that is rotting, cracking or blown off | Siding replacement |
| Get low-upkeep siding at a moderate price | Vinyl siding installation |
| Get fire-resistant siding that looks like painted wood | Fiber cement siding installation |
| Install James Hardie products by name, in ColorPlus colors | James Hardie siding installation |
| Redo siding, windows, doors, trim and entry together | Exterior renovation |
Siding costs at a glance
Typical totals for a 1,500 to 2,500 square foot house in mid-range products, with wrap, flashing and trim counted in. The written estimate uses the same line items, so a competing bid lines up next to it.
| Service | Typical range | Typical time |
|---|---|---|
| Siding installation | $6k–$62k | 1 to 4 weeks |
| Siding replacement | $4k–$68k | 2 days to 4 weeks |
| Vinyl siding installation | $11k–$40k | 1 to 2 weeks |
| Fiber cement siding installation | $22k–$78k | 2 to 5 weeks |
| James Hardie siding installation | $24k–$84k | 2 to 5 weeks |
| Exterior renovation | $20k–$200k+ | 3 to 12 weeks |
These are usual totals with labor, materials, tear-off, disposal and permits counted; after the visit your written estimate swaps the range for one fixed number.
Siding before and after




How a siding project runs
Four steps, the same for a single repaired wall or a complete exterior with new windows and an entry.
Step 01
On-site visit, scope review, honest repair-or-replace opinion. No pressure, no decision needed that day.
Step 02
Itemized quote with Good, Better and Best options, a declared contingency and a dated schedule.
Step 03
We pull permits, schedule inspections and send you a room-by-room prep checklist.
Step 04
Daily updates, clean site every evening, final walkthrough and a written warranty in your hand.
Written into every contract
The approved price is the final price. Change orders only with your written approval.
A credit for every working day of delay we cause. Weather and inspections excepted, in writing.
Dust barriers, floor protection and a clean-up before we leave. Your home stays livable.
A text or email every working day with photos and tomorrow's plan, or the day is free.
Workmanship warranty in writing, transferable to the next owner, backed by a fixed address.
A small deposit, then you pay only for work that is already completed, inspected and photographed.
Other exterior work we quote
Siding repairs, trim, flashing and caulking are handled by the crews already on your walls and added as lines to the siding estimate, with no second contractor involved.
Siding questions
A repair is enough when the damage sits on one wall, usually under a window or roof edge, and the boards around it test dry. Replacement makes sense when soft or swollen boards appear on several walls or water has reached the inside. We test every wall and put both prices in writing.
Vinyl costs roughly half as much, never needs paint and suits rentals and tighter budgets. Fiber cement lasts longer, resists fire, dents and woodpeckers, and looks like painted wood. Many owners compare both, so we price them side by side.
It is one maker of fiber cement, with the widest color range, climate-specific products and a matching trim line. Other makers can cost less or suit modern panel facades better. The James Hardie page covers its products; the fiber cement page compares brands.
When windows and siding are both near the end of their life, or you plan to sell within a couple of years. Doing them together saves scaffolding and setup, puts windows in before siding and gets colors that match.
A repair or one-wall replacement takes two to four days. Vinyl on a whole house takes one to two weeks, fiber cement two to four, and a full exterior renovation with windows and an entry six to twelve weeks.
Crew wages, dump fees and permit rules differ widely across states and even counties, and climate changes which products make sense. The ranges here are national typicals; the estimate you receive is worked out for your street once we have seen the house.
Siding crews near you
Each siding job is handled by a nearby exterior crew licensed in the state the house belongs to, and every state license number is published.
Free siding estimate
Name the siding job you have in mind and an exterior supervisor texts you back, within 5 minutes on business days, to set the walk-around.