Primary bathroom remodel · Licensed & insured · Best of Houzz

A primary bathroom remodel decided together, priced line by line.

The bathroom off your bedroom is the one room you use twice a day for the next twenty years. A licensed suite supervisor walks it with both of you, then sends three written prices that show what each upgrade adds: the second sink, the bigger shower, the tub, the warm floor.

Text a photo of the room and a floor sketch. A supervisor who plans primary suites replies within 5 minutes during business hours.

  • $55k–$95kTypical full suite
  • 7 wksFull suite average
  • 4.9410 reviews
  • 24hWritten estimate

What happens after you text us

Both of you talk to one supervisor, who stays on the job to the end.

A primary suite usually has two decision makers and one budget. The first exchange sorts out who wants what, asks for one photo of the old tub, and books a visit at a time you can both be home.

  • One supervisor for both of you, from the first text to the walkthrough
  • A photo of the tub deck tells us how hard the demolition will be
  • A visit set for evenings or weekends when both of you are home
Text me my quote

What a primary bathroom remodel costs

A primary bathroom remodel costs $30,000 to $160,000. The upgrades decide where you land.

Ranges are for a 100 to 180 square foot primary bathroom at current labor rates. The middle tier is where most couples settle: a full gut with a double vanity, a large glass shower and a heated floor, inside the room you already have.

Suite update

$30k–$50k

Same footprint and plumbing spots, much better finishes. Five to six weeks with one bathroom out.

  • Double vanity with quartz top
  • Tiled shower with glass door
  • Tub replaced or removed
  • Porcelain floor and wall tile
  • New lighting and mirrors
  • Quiet fan sized to the room
Get my suite update estimate

Expanded suite

$100k–$160k+

The room grows into a closet or bedroom. Nine to twelve weeks, with framing, engineering and permits.

  • Everything in Full primary remodel
  • Wall moved into closet or bedroom
  • Separate water closet with a door
  • Steam shower or dual shower heads
  • Natural stone or slab walls
  • Rebuilt closet on the other side
Get my expanded suite price

Rough out your primary suite budget

Choose a finish level, the size of the room and the kind of house. The number updates with every choice, using the tiers our suite supervisors price from.

A range, not a quote. Your written estimate comes after the visit and does not change once you approve it.

Typical range for your answers$55,000 to $95,000

Turn this range into our written suite price

Where the money goes

Tile and the shower glass cost more than the tub. Labor still takes the biggest share.

Averages from our recent full primary remodels. A large shower means more tile to set and heavier glass to fit, which is why the shower decision moves the budget more than the tub decision does.

Get my itemized suite estimate
Floor plan of a primary bathroom before and after a closet wall moved to widen the vanity wall
Moving one closet wall gave this suite a second sink and a walk-in shower

Stay in the room or borrow space

Keep the footprint if two people fit. Borrow space from the closet if they do not.

Moving a wall into a closet adds $15,000 to $35,000 and a few weeks, but it can turn a cramped suite into one two people use at once. At the visit we measure clearances and write down which answer fits your room.

If this is trueWe recommend
The vanity wall is at least 72 inches longKeep footprint
Two people cannot pass each other at the sinkBorrow space
The old tub deck can become the new showerKeep footprint
You want a tub and a large shower in the same roomBorrow space
The closet next door is deep and rarely fullBorrow space
The wall you want to move carries the roofKeep footprint

How long it takes

A full primary remodel takes seven weeks, most of it after the tile is ordered.

A suite update takes five to six weeks, an expanded suite nine to twelve. You use the hall bathroom meanwhile, and we keep the bedroom sealed off from the dust with zippered plastic walls.

Couple reviewing a primary bathroom layout drawing

Weeks before

Design and selections

Layout drawn, tub, glass and vanity chosen and ordered, permit filed. Nothing is torn out until they arrive.

Primary bathroom framed with new drain lines

Weeks one and two

Demolition and framing

Old tub and tile out, walls reframed, new drains, valves and heat wires placed, inspection passed.

Heated floor mat laid before tile installation

Weeks three to five

Shower and tile

Shower pan sloped, membrane flood-tested, heated floor mats set, then wall and floor tile go in.

Finished primary bathroom with glass shower and freestanding tub

Weeks six and seven

Glass, vanity, walkthrough

Glass measured after tile, vanity and tub set, trim and paint, then a walkthrough with both of you.

What we find in older primary baths

Four in ten primary suites we open have a water heater too small for the new shower.

A bigger shower and a soaking tub use far more hot water than the old setup. These are the six findings that come up most in primary remodels, each photographed, priced as its own line and approved by you before work continues.

42%

Water heater too small for a big tub

A 70-gallon soaking tub drains a 40-gallon tank. We price a larger tank or a tankless unit as a separate line for you to approve.

33%

Jetted tub motor with a hidden leak

Old whirlpool pumps and hoses often drip into the floor for years. We remove the motor and check the joists beneath it.

27%

Shower drain too small for a rain head

A large rain head can pour more water than an old 1.5-inch drain takes. We upsize the drain so the shower never floods.

24%

No room left in the electrical panel

A heated floor, lighted mirrors and a fan each want a circuit. If the panel is full, we add a subpanel or a larger one.

22%

Floor too weak for stone or cast iron

A filled cast iron tub can weigh 900 pounds. We add joists or blocking under it so the tile never cracks.

14%

Closet wall that carries the roof load

If the wall you want to move is load-bearing, an engineer sizes a beam. It adds a week and its own line on the estimate.

What your suite is made of

The upgrades are named brand by brand, so you choose what is worth it.

In a primary suite the price gap between two quotes is usually in five places: glass, tub, vanity, floor heat and shower valve. We name the product for each, so you can see what you are paying for.

Frameless glass shower enclosure with brushed hardware

Frameless shower glass

Three-eighths inch tempered glass with a clear coating that sheds water spots. Measured after the tile so the gaps stay tight.

White freestanding soaking tub under a window

Freestanding tubs

Acrylic or cast mineral tubs from Victoria + Albert and Kohler hold heat longer than steel and weigh far less than cast iron.

Custom double vanity with two undermount sinks

Custom vanities

Double vanities built to your height, often 36 inches instead of the old 30, with drawers for each person and outlets inside them.

Programmable thermostat for a heated bathroom floor

Heated floors

Schluter Ditra-Heat or Nuheat mats under the tile, run by a programmable thermostat so the floor is warm when your alarm goes off.

Thermostatic shower valve with separate volume control

Thermostatic valves

Hansgrohe and Grohe thermostatic valves hold the exact temperature you set and run a rain head and a handheld at the same time.

Porcelain slab shower walls with a recessed niche

Stone and slab walls

Quartz or porcelain slab panels on the shower walls leave almost no grout to scrub, and marble adds veining no two rooms share.

Written into every contract

Six promises you can hold us to.

Price lock

The approved price is the final price. Change orders only with your written approval.

On-time or we pay

A credit for every working day of delay we cause. Weather and inspections excepted, in writing.

Clean site, every day

Dust barriers, floor protection and a clean-up before we leave. Your home stays livable.

Daily update guarantee

A text or email every working day with photos and tomorrow's plan, or the day is free.

10-year warranty

Workmanship warranty in writing, transferable to the next owner, backed by a fixed address.

Milestone payments

A small deposit, then you pay only for work that is already completed, inspected and photographed.

Price our suite with these guarantees

Who is in your house

Three named people work in your bedroom wing, and nobody else.

A primary suite sits in the most private part of the house. Every person is background-checked, introduced by name before day one, and works behind a sealed plastic wall that keeps dust away from your bed and closet.

Suite supervisor

Suite supervisor

Runs the schedule, sends daily photos, answers both of you.

Lead carpenter

Lead carpenter

Frames walls, sets the vanity and builds the storage.

Tile and stone setter

Tile and stone setter

Slopes the shower pan, sets tile and fits the slab walls.

Illustrative project scopes

Primary bathroom remodel: scope and budget examples.

Planning examples with illustrative budgets and durations. These are not completed customer jobs, invoices or promises about your project.

Tub deck turned into a walk-in

Tub deck turned into a walk-in

Example budget
$62,800
Example duration
7 weeks
Record type
Illustrative scope
Finish upgrade, same layout

Finish upgrade, same layout

Example budget
$41,300
Example duration
5 weeks
Record type
Illustrative scope
Suite widened into the closet

Suite widened into the closet

Example budget
$118,900
Example duration
11 weeks
Record type
Illustrative scope

Your suite is not average

Your plans for the suite are specific. Here is how the price follows them.

The three tiers above are the starting point. These are the cases we price most often in primary suites, and what each one changes in scope, cost or time.

Staying in the house for good

Couples in their fifties and sixties ask for a zero-step shower, a bench, blocking for grab bars and a taller toilet now, while the walls are open. It adds little to the cost and saves a second remodel later.

Plan a suite we can grow old in

A hotel-level finish

Slab walls, a steam shower, two rain heads, a warm floor and lighting on dimmers. Each upgrade is a separate line with its own price, so you can keep the three that matter and drop the rest without a new estimate.

Price my high-end primary suite

You disagree on the layout

One wants the tub, the other wants a bigger shower. We draw both versions to scale, price them side by side and show where they differ, so the decision is about numbers and space rather than opinions.

Get both layouts priced side by side

Different wake-up times

When one of you rises at five, a toilet behind a pocket door, a quiet fan and a sink with its own light make a real difference. We plan the lighting and the door placement so one person can get ready alone.

Plan a suite for two schedules

A small suite in an older house

Many older homes still have a primary bath of 50 square feet or less. We check whether a closet or a hallway nook can be borrowed, and price the framing, the permit and the engineer if a wall has to move.

See if my suite can grow

A ceiling you will not cross

Keeping the toilet and drains in place, choosing porcelain that looks like marble and a stock vanity in a custom size can save $20,000 or more. We show which cuts you will notice and which ones you never will.

Get my primary suite on budget

Selling in the next few years

Buyers of family houses look hard at the primary suite. We scope a double vanity, a large glass shower and neutral tile that appraises well, and skip steam and slab walls that rarely come back at sale.

Scope a suite that pays back at sale

Cold floors and cold winters

An outside wall and a tile floor make a primary suite cold for months. We insulate open exterior walls, add a heated floor on a timer and seal the window, so the room is warm when you step out of the shower.

Price a warm primary bathroom

What this service is

A primary bathroom remodel, in plain terms.

Primary bathroom remodeling is the renovation of the private bathroom attached to the main bedroom, usually adding a double vanity, a larger walk-in shower, a soaking tub, a heated floor or a separate toilet room. ProBuild Remodeling performs it as a licensed general contractor, with a design step, permits under our license and one supervisor through the walkthrough.

It covers a finish upgrade inside the same layout, a full gut with fixtures rearranged within the room, and an expansion into a closet or part of the bedroom when the room is too small for two. It includes the plumbing, electrical and framing that those changes need. It does not include bedroom or closet furniture, or rooms outside the suite, unless they are written into the scope.

It is for couples who plan to stay in the house and want a bathroom two people can use at once, and for homeowners adding safety features they will need later. It is not the right service for a hall or guest bath, which has its own page, or for a single shower swap in a primary bath.

Terms on a primary suite estimate

Water closet
A small room or nook with its own door that holds the toilet, so one person can use it while the other is at the sink.
Thermostatic valve
A shower valve that holds a set temperature and can run a rain head and a handheld at once, each with its own volume.
Freestanding tub
A tub that stands on its own feet or base with finished sides, set away from the walls rather than dropped into a deck.
Heated floor mat
Thin electric heating cable set in the thinset under the tile, run by a thermostat with a timer. Needs its own circuit.
Frameless glass
Thick tempered glass panels held by hinges and clips instead of a metal frame, so there is less to clean.
Load-bearing wall
A wall that holds up the floor or roof above. Moving it needs a beam sized by an engineer and its own permit.
Tankless water heater
A unit that heats water only as it flows, so a large tub and a long shower never run the supply cold.
Selections
The final list of tile, fixtures, glass and vanity you choose before ordering. Changes after ordering are priced as change orders.

Questions couples ask about primary suites

Eight things couples ask before remodeling the primary bath.

How much does a primary bathroom remodel cost?

A full primary remodel with a double vanity, a large glass shower and a heated floor usually costs $55,000 to $95,000. A finish upgrade in the same layout starts around $30,000, and expanding into a closet or bedroom runs $100,000 to $160,000 or more.

Should we keep a tub in the primary bathroom?

Keep one if either of you will actually soak in it and there is room for a large shower too. If there is already a tub in the hall bath, many couples give the primary suite a larger walk-in shower instead and lose nothing at resale.

How much space does a double vanity need?

A comfortable double vanity is 60 to 72 inches wide, with sink centers about 30 inches apart. Below 60 inches two people bump elbows, so we suggest one long sink or borrowing space from a closet.

Is a heated bathroom floor worth the cost?

For most primary suites, yes. The mat, thermostat and circuit add roughly $2,000 to $4,000, it costs little to run on a timer, and it is the upgrade couples mention most often at the walkthrough.

How long does a primary bathroom remodel take?

A finish upgrade takes five to six weeks, a full remodel six to nine, and an expanded suite nine to twelve. Most of the calendar is set by special-order items, so we order the tub, glass and vanity before demolition starts.

Can we live in the bedroom during the remodel?

Yes. We seal the bathroom door with a zippered plastic wall, cover the path through the bedroom, and run an air scrubber during demolition. Most couples keep sleeping in the room and use the hall bathroom.

What is a water closet and do we need one?

It is a separate small room for the toilet, with its own door and fan. It needs about 30 by 60 inches and a pocket or swing door. Couples with different schedules find it one of the most useful changes in the suite.

Does a steam shower need anything special?

Yes. It needs a vapor-proof membrane on every wall and the ceiling, a sloped ceiling so drips run off, a sealed glass door with a transom and a dedicated circuit for the generator. We price it as its own line.

Primary suite remodels near you

Your remodeling address, within our service area.

Suite projects are built by crews who live in the area, under the contractor license held in your state. You can check each license number on our licenses page before the visit.

  • Maine
  • New Hampshire
  • Massachusetts
  • Rhode Island
  • Connecticut
  • New York
  • New Jersey
  • Pennsylvania
  • Delaware
  • Maryland
  • Virginia
  • North Carolina
  • South Carolina
  • Georgia
  • Florida
  • Check your remodeling address

Free primary suite estimate

Tell us what each of you wants. We price both versions in writing.

Send the your answers and a supervisor texts back within 5 minutes during business hours to book a visit when both of you can be there.

Text my quote Call now

Your remodeling question

Discuss Primary bathroom remodel

Tell us what you want to change. Request a call or estimate; preferred visit times are confirmed separately.

Pre-book a visit (optional)

A supervisor confirms the slot by phone or text before it is booked.

Before your next decision

Still comparing your remodeling options?

Review the questions that make estimates easier to compare, or ask about your own project when you are ready.