Sold a new roof you did not need
A single leak at a pipe boot is often quoted as a full replacement. We photograph the cause and write down repair or replace, so you decide with the evidence in your hand.
Roofing services · Licensed & insured · Local crews
Leak repair, full replacement, asphalt shingle and metal roofs, storm damage and gutters, all handled by one licensed roofing team. Every service below shows its typical price and how long it takes. For an active leak, a roofer comes the same day whenever the schedule allows.
Text a photo of the roof or the ceiling stain. A licensed roofer answers within 5 minutes during business hours and tells you whether it sounds like a repair or more.
Why roof jobs go wrong
Homeowners rarely regret the shingle they picked. They regret replacing a roof that needed a repair, patching one that needed replacing, or trusting a crew that was gone by the time it leaked again.
A single leak at a pipe boot is often quoted as a full replacement. We photograph the cause and write down repair or replace, so you decide with the evidence in your hand.
Caulk over old flashing fails within a season or two. Our repairs use new flashing and boots, the same parts as a new roof, and we check the spot after the next heavy rain.
After hail, out-of-town crews sign contracts at the door and leave. Ours are local, licensed in your state and still answer the phone when the warranty matters.
Roofing services we provide
Start with the one that matches what you see on your roof or ceiling. Each page shows price tiers, the repair-or-replace test, what we find once shingles come off and the questions people ask.
Full tear-off to the wood deck, new underlayment, flashing and shingles, with the decking checked sheet by sheet.
Leaks, flashing, pipe boots and missing shingles fixed fast, with a written repair-or-replace opinion and photos.
Three-tab, architectural or designer shingles from GAF, Owens Corning and CertainTeed, compared by price, wind and hail rating.
Standing seam or exposed fastener steel roofs, priced side by side, with snow guards and noise explained up front.
Hail and wind damage tarped fast, documented slope by slope for your insurer, and repaired or replaced to code.
One-piece aluminum gutters formed on site, oversized downspouts, guards and rotted fascia replaced in the same visit.
Not sure which one you need
Most people know the symptom, not the name of the job. Find the line that sounds like your house; the roofer confirms it on the roof, with photos.
Ask a roofer which one fits| If you have | Start with |
|---|---|
| A drip, a ceiling stain or a few missing shingles | Roof repair |
| Hail dents, wind damage or a tree on the roof | Storm damage roof repair |
| Curling, bald or cracked shingles on most slopes | Roof replacement |
| A new roof coming and questions about which shingle | Asphalt shingle roofing |
| A wish for a roof that lasts 50 years or sheds snow | Metal roofing |
| Water spilling over gutters or pooling at the foundation | Gutter installation |
Roofing costs at a glance
Ranges assume a typical two-story house of about 2,000 square feet. Your written estimate itemizes tear-off, decking, flashing and materials so it can be compared with any other roofer's quote.
| Service | Typical range | Typical time |
|---|---|---|
| Roof replacement | $10k–$55k | 1 to 5 days on site |
| Roof repair | $400–$28k | Same day to 4 days |
| Asphalt shingle roofing | $8k–$38k | 1 to 4 days |
| Metal roofing | $12k–$75k | 3 to 8 days |
| Storm damage roof repair | $350–$30k | Tarp same day, repair in 1 to 4 days |
| Gutter installation | $1.2k–$15k | 1 to 2 days |
Ranges are typical totals with labor, materials, permits and disposal, before any insurance payment; your written estimate replaces them with a fixed price after the inspection.
Roofs before and after




How a roofing job runs
The same four steps for every roofing service, whether it is one pipe boot or a full metal roof.
Step 01
On-site visit, scope review, honest repair-or-replace opinion. No pressure, no decision needed that day.
Step 02
Itemized quote with Good, Better and Best options, a declared contingency and a dated schedule.
Step 03
We pull permits, schedule inspections and send you a room-by-room prep checklist.
Step 04
Daily updates, clean site every evening, final walkthrough and a written warranty in your hand.
Written into every contract
The approved price is the final price. Change orders only with your written approval.
A credit for every working day of delay we cause. Weather and inspections excepted, in writing.
Dust barriers, floor protection and a clean-up before we leave. Your home stays livable.
A text or email every working day with photos and tomorrow's plan, or the day is free.
Workmanship warranty in writing, transferable to the next owner, backed by a fixed address.
A small deposit, then you pay only for work that is already completed, inspected and photographed.
Other roofing work we quote
These are handled by the same roofers and written as lines in your roofing estimate, so one crew is responsible for the whole roof.
Roofing questions
A repair fits when the problem has one cause, such as a pipe boot, a flashing or a few wind-lost shingles, and the rest of the roof lies flat. A replacement fits when shingles are worn, curling or bald on most slopes or leaks keep appearing in new places.
Architectural shingles cost less up front and last 25 to 30 years. Standing seam metal costs about two to three times as much and lasts 40 to 70 years. Metal makes sense if you plan to stay for decades, get heavy snow or plan solar panels.
The repair work is similar, but storm damage adds documentation for an insurance claim: photos of every slope, dented vents and gutters, and a report your adjuster can use. We also meet the adjuster on the roof if you file.
A leak repair, usually done in one visit, often the day you call. Gutter installation takes one day for most houses. A shingle roof replacement takes one to three days on site, and a metal roof three to eight days once the panels arrive.
If the gutters are old or sagging, yes: the new drip edge and gutter apron go in with the roof, and one crew handles both. Sound gutters can be taken down and rehung for less. We price both options in the same estimate.
Yes. Labor, permit fees and wind or ice code requirements differ by state and county, so the ranges on these pages are typical, not local. Your written estimate is priced for your address after the inspection.
Roofers near you
Roofs are inspected and built by local crews who work under the license of their state and know how storms hit your area. License numbers are listed state by state.
Roof inspection
Pick the roofing service closest to your situation and a roofer texts back within 5 minutes during business hours with an inspection time, the same day for active leaks whenever possible.