Whole home remodeling · Licensed & insured · NARI member

Whole home remodeling with one plan for every room,
in the right order.

When the kitchen, the baths and the floors all need work, doing them one at a time means paying to open the same walls twice. A licensed supervisor walks the whole house and sends a written estimate in three scopes within 24 hours, sequenced room by room.

List the rooms that bother you in a text. A whole-home supervisor replies within 5 minutes during business hours and books a walk-through.

  • 10–20%Saved vs room by room
  • 3–5 moMulti-room remodel
  • 4.9410 reviews
  • 24hWritten estimate

What happens after you text us

A supervisor asks for the whole list. Then puts it in order.

Homeowners usually start with the room that annoys them most. The first exchange collects the full list, asks which rooms you cannot live without, and ends with a walk-through date and an estimate date.

  • One supervisor for every room, from plan to punch list
  • Your list sorted by what must happen first, not what is loudest
  • Walk-through and written estimate dated before the chat ends
Text me my quote

What a whole home remodel costs

A whole home remodel costs $60,000 to $450,000. The number of wet rooms decides most of it.

Prices assume a 1,500 to 2,500 square foot house with mid-range materials. Kitchens and bathrooms cost several times more per foot than bedrooms and living rooms, so the scope count matters more than the square footage.

Whole-home refresh

$60k–$120k

Paint, floors, lighting and fixtures in every room, layout kept. Six to ten weeks, often livable.

  • Interior paint throughout
  • New flooring on the main levels
  • Doors, trim and hardware
  • Light fixtures and switches
  • Bath vanities and fixtures
  • Kitchen counters and backsplash
Price my whole-home refresh

Remodel with layout

$250k–$450k+

Walls moved, plan opened, systems updated in several rooms. Five to eight months, engineered.

  • Everything in Multi-room remodel
  • Bearing walls removed with beams
  • Kitchen moved or enlarged
  • New HVAC ducts or system
  • Electrical panel upgrade
  • Permits and structural drawings
Price my remodel with a new layout

Price your whole-home remodel in ten seconds

Choose the scope, the size of the house and its age. The range updates with each pick, from the same three scopes our supervisors sequence and price.

A range, not a quote. Your written estimate comes after the visit and does not change once you approve it.

Typical range for your answers$120,000 to $250,000

Turn this range into a written whole-home estimate

Where the money goes

Kitchen and baths take half the budget. The other rooms share the rest.

Averages from recent multi-room remodels. The wet rooms carry the cabinets, tile, plumbing and fixtures, which is why adding a bedroom to the scope moves the price far less than adding a bathroom.

Get my itemized whole-home estimate
Whole house under renovation at once on the left, one finished floor and one in progress on the right
One project saves setup costs; phases spread out payments and disruption

All at once or in phases

Do it all at once when you can move out or the rooms connect. Phase it when cash or daily life cannot stretch.

One continuous project costs less because walls, dust protection and crews are set up once. Phasing costs a little more but spreads the payments and the disruption. At the walk-through we check six things and write down which path fits your house.

If this is trueWe recommend
The house is empty or you can stay elsewhereAll at once
You need a working kitchen every dayIn phases
Rooms share plumbing or walls being movedAll at once
Savings arrive over the next year or twoIn phases
You just bought the house and have not moved inAll at once
One room is urgent and the rest can waitIn phases

How long it takes

A multi-room remodel takes three to five months, sequenced so you always have a bathroom.

A refresh takes 6 to 10 weeks, a remodel with layout changes 5 to 8 months. Work moves from the rough, messy trades to the clean ones, so finished rooms are not damaged by the work still going on.

Supervisor walking a house with a room-by-room plan

Before day one

Plan and sequence

Whole-house walk-through, three scopes, selections for every room, permits. Four to eight weeks.

Opened bathroom wall showing new plumbing rough-in

First month

Demolition and rough-in

Rooms opened in planned order, plumbing and wiring updated behind the walls, inspections passed.

Kitchen cabinets installed while a bath is tiled

Middle months

Wet rooms and cabinets

Bathrooms and kitchen built one after the other, so there is always one bath and a cooking station.

New hardwood floor running through finished rooms

Final weeks

Floors, paint, walkthrough

Floors laid through the house last, then paint, trim and one punch list walkthrough for every room.

What we usually find across the house

In half of the houses we remodel, the electrical panel needs work before the rooms do.

Opening several rooms means seeing more of the house than any single remodel would. These are the six issues we find most often. Each is photographed, priced and approved by you before we fix it.

52%

Panel too small for a modern house

A new kitchen, bath fans and heated floors need capacity. We upgrade the panel or service once, instead of room by room.

34%

Old supply pipes throughout the house

Galvanized steel or early plastic lines narrow and leak. We repipe while walls are open, which costs far less than doing it later.

41%

Floors at different heights between rooms

Past remodels left tile and wood at different levels. We level the subfloor so one flooring runs through without ramps or lips.

38%

Bath fans vented into the attic

Moist air has been soaking the attic. We run each fan to the outside so new bathrooms do not mold the roof above them.

22%

Lead paint on trim and windows

Common in older homes. We test, then follow EPA lead-safe rules with sealed rooms and HEPA cleanup wherever we disturb paint.

29%

Ducts too small for the rooms they serve

Some rooms never got enough air. We resize or add runs while ceilings are open, so every room heats and cools evenly.

What runs through your whole house

Finishes are chosen together, so the house reads as one home, not six projects.

The risk in a multi-room remodel is a house where every room looks like a different year. We plan the floor, the trim, the fixtures and the paint as one set, and name each product in your estimate.

Engineered oak floor running through open rooms

Continuous flooring

Engineered oak from brands like Mohawk or Shaw, or waterproof LVP from COREtec, run through the main rooms without breaks.

Matching door casing and baseboard in a hallway

Matched trim package

One door style, one casing and one baseboard profile through the house, in primed MDF or poplar, painted the same white.

Matching brushed nickel faucets in kitchen and bath

Plumbing fixture finish

One faucet line from Moen, Delta or Kohler in one finish for the kitchen and every bath, so the house feels planned.

Freshly painted living room in a coordinated palette

Interior paint system

Sherwin-Williams or Benjamin Moore low-VOC paint in a coordinated palette, with scrubbable finishes in halls and kids' rooms.

LED recessed lighting in a remodeled living room

Lighting plan

LED recessed lights, dimmers and fixtures chosen room by room from one plan, so color temperature matches from space to space.

Solid-core interior door with matte black lever

Doors and hardware

Solid-core interior doors from Masonite or Jeld-Wen with one hardware line throughout, which quiets rooms and feels solid.

Written into every contract

Six promises you can hold us to.

Price lock

The approved price is the final price. Change orders only with your written approval.

On-time or we pay

A credit for every working day of delay we cause. Weather and inspections excepted, in writing.

Clean site, every day

Dust barriers, floor protection and a clean-up before we leave. Your home stays livable.

Daily update guarantee

A text or email every working day with photos and tomorrow's plan, or the day is free.

10-year warranty

Workmanship warranty in writing, transferable to the next owner, backed by a fixed address.

Milestone payments

A small deposit, then you pay only for work that is already completed, inspected and photographed.

Get my whole-home estimate with these guarantees

Who runs your remodel

One supervisor for every room, so nothing falls between two contractors.

The value of one contract is one person accountable for the order of work. You meet the supervisor, the lead carpenter and the designer before demolition, and they stay through the last room.

Whole-home supervisor

Whole-home supervisor

Sequences every room, runs inspections and sends daily updates.

Lead carpenter

Lead carpenter

Handles walls, cabinets, doors and trim in every room of the plan.

Designer

Designer

Keeps finishes consistent and helps you choose for all rooms.

Illustrative project scopes

Whole home remodeling: scope and budget examples.

Planning examples with illustrative budgets and durations. These are not completed customer jobs, invoices or promises about your project.

Split-level, kitchen and 2 baths

Split-level, kitchen and 2 baths

Example budget
$168,400
Example duration
4 months
Record type
Illustrative scope
Colonial refresh, 9 rooms

Colonial refresh, 9 rooms

Example budget
$94,700
Example duration
9 weeks
Record type
Illustrative scope
Ranch opened with new layout

Ranch opened with new layout

Example budget
$318,000
Example duration
7 months
Record type
Illustrative scope

Your house is not average

Your house and your plans are different. Here is how the estimate follows them.

Every whole-home remodel starts from the same three scopes, then changes with the house, the budget and how you will live during it. Pick the case that sounds like yours.

Just bought the house

The weeks between closing and moving in are the cheapest time to remodel several rooms, because nobody is living around the work. We plan the scope before closing so the crew can start within days of getting the keys.

Plan my remodel before we move in

Room by room over time

When the budget arrives in stages, we still write one plan for the whole house with a price for each phase. Each phase sets up the next, so nothing new gets torn out and the rooms end up looking like they belong together.

Plan my whole house in phases

Living there with kids

With children at home, we keep one bathroom and a cooking station working at all times, seal work areas with zip walls and finish the kids' rooms early so bedtime stays normal while the rest of the house is torn up.

Plan a remodel we can live through

An older house

Older homes often need wiring, plumbing and insulation updates that no single-room remodel would fix. The whole-home estimate names each system, what code requires once walls open, and what can wait for a later phase.

Price updates for my older house

Selling within two years

Buyers pay for a house that feels finished throughout. We scope the rooms that move the appraisal most, keep choices neutral and skip upgrades a buyer would not pay for, so the budget goes where the sale price follows.

Price a pre-sale whole-home update

Staying in the house for good

A whole-home plan is the moment to widen doors, add a curbless shower, lever handles and brighter lighting in every room at once. It looks like a normal remodel and saves a second project in a few years.

Plan a whole home for staying put

A fixed total budget

Give us the number and we build the scope to fit it: which rooms get a full remodel and which get a refresh. We show where the money moves value most and where a cheaper finish looks the same from the doorway.

Fit a whole-home plan to my budget

Pets in the house

Dogs and cats need a safe room while doors are open and crews move in and out. We set up a closed pet zone, keep gates at work areas and choose floors and finishes that stand up to claws after the crew leaves.

Plan a remodel around my pets

What this service is

Whole home remodeling, defined the way we quote it.

Whole home remodeling is the renovation of several rooms of an occupied or newly bought house, typically the kitchen, bathrooms, floors and finishes, planned as one project with one contract, one schedule and one supervisor. ProBuild Remodeling performs it as a licensed general contractor, sequencing the trades so no wall or floor is opened twice.

The service covers three levels: a refresh of paint, floors and fixtures across the house, a multi-room remodel of the kitchen and baths with new floors, and a remodel that moves walls and updates systems. Rooms keep their studs and most of their structure. Taking the house down to the studs is a gut renovation, and adding square footage is an addition, each with its own page.

It is for families who just bought an older house, owners who have put off several rooms for years, and couples preparing a house to stay in or to sell. It is not for one-room projects, which cost less as a single remodel, or for houses with failing structure or systems throughout, where a gut renovation is the honest recommendation.

The words you will see on your whole-home estimate

Scope of work
The written list of every room and task in the project. Anything not listed is not in the price, and we say so.
Sequencing
The order in which rooms and trades are scheduled, so rough work never damages finished work and a bath always works.
Wet rooms
Kitchens, bathrooms and laundry: the rooms with plumbing. They cost the most per square foot in any remodel.
Selections
Every finish you choose, from flooring to faucets. Chosen before work starts so nothing waits on a decision mid-project.
Zip wall
A floor-to-ceiling plastic dust barrier with a zipper door that keeps the work area sealed from the lived-in rooms.
Phase
A section of the project with its own price and dates. Phases let you pay for and live through the work in parts.
Service upgrade
Increasing the power the utility delivers to the house, often from 100 to 200 amps, for a modern kitchen and baths.
Punch list
The final list of small corrections, room by room, agreed at the walkthrough and finished before the last payment.

Questions we hear on every whole-home call

The eight questions people ask before remodeling several rooms.

How much does it cost to remodel a whole house?

For a 1,500 to 2,500 square foot house, a refresh of paint, floors and fixtures usually runs $60,000 to $120,000. Remodeling the kitchen and two baths plus floors runs $120,000 to $250,000, and adding layout changes $250,000 and up.

Is it cheaper to remodel the whole house at once?

Usually 10 to 20 percent cheaper than the same rooms done as separate projects years apart. Protection, dumpsters, permits and crews are set up once, and walls opened for plumbing or wiring are opened only one time.

Can we live in the house during a whole home remodel?

Most families do for a refresh or multi-room remodel. We keep one bathroom and a cooking station working, seal work areas with zip walls and clean daily. For layout changes across the house, a few weeks away is often easier.

What order should rooms be remodeled in?

Messy and structural work first, clean work last: wiring, plumbing and walls, then kitchen and baths, then floors and paint. That order protects finished rooms and keeps one bath running throughout.

How long does a whole home remodel take?

A refresh takes 6 to 10 weeks, a multi-room remodel 3 to 5 months and a remodel with layout changes 5 to 8 months. Planning, selections and permits take four to eight weeks before work begins.

What is the difference between a whole home remodel and a gut renovation?

A whole home remodel updates rooms while keeping most walls, ceilings and systems. A gut renovation strips the house to its studs and replaces wiring, plumbing and insulation throughout. We tell you which one your house needs at the walk-through.

Can we split the whole home remodel into phases?

Yes. We write one plan for the whole house with a price for each phase, so every step fits the next. Phasing adds some cost for repeated setup but lets you spread payments and disruption over months or years.

Do we have to choose every finish before you start?

Yes, for the rooms in the current phase. Choosing flooring, tile, cabinets and fixtures up front is what lets us give a fixed price and keep the schedule, because nothing waits on a decision or a back-ordered item.

Whole home remodeling near you

Your remodeling address, within our service area.

Permit rules for multi-room work vary by town. Every whole-home project is run by a local supervisor and crew under the license of the state the house is in.

  • Maine
  • New Hampshire
  • Massachusetts
  • Rhode Island
  • Connecticut
  • New York
  • New Jersey
  • Pennsylvania
  • Delaware
  • Maryland
  • Virginia
  • North Carolina
  • South Carolina
  • Georgia
  • Florida
  • Check your remodeling address

Free whole-home estimate

Send your answers now. Get three sequenced scopes priced in writing.

Your whole-home supervisor reads the answers, texts back within 5 minutes during business hours and books the walk-through of the entire house in the same thread.

Text my quote Call now

Your remodeling question

Discuss Whole home remodeling

Tell us what you want to change. Request a call or estimate; preferred visit times are confirmed separately.

Pre-book a visit (optional)

A supervisor confirms the slot by phone or text before it is booked.

Before your next decision

Still comparing your remodeling options?

Review the questions that make estimates easier to compare, or ask about your own project when you are ready.