An accessory dwelling unit is a second, complete home on your property with its own kitchen, bathroom and entrance. We check what your zoning allows, design it, bring water, sewer and power to it, pull the permits and build it, usually in four to seven months on site.

Text your address and a photo of the backyard and a licensed supervisor tells you within five minutes on business days what to check first.

  • $180kTypical detached
  • 4โ€“7 moBuild on site
  • 4.9410 reviews
  • 24hWritten estimate

How an ADU conversation starts

Your address comes first. Zoning decides what can be built.

Before anyone talks about floor plans, the supervisor looks up your lot size, zoning and setbacks. Then he asks where the sewer line leaves the house, books a lot visit and gives you a date for the estimate.

  • Zoning and setbacks checked before the first visit
  • The sewer route often decides where the ADU goes
  • Lot visit and estimate date agreed in one thread
Text me my quote

What an ADU costs to build

A new ADU costs $110,000 to $450,000. Detached, size and utilities set the price.

Prices include design, engineering, permits, foundation, utilities within about 100 feet and mid-range finishes. Most of our ADU customers choose the one-bedroom detached cottage, which rents well and keeps privacy for both homes.

Attached ADU

$110kโ€“$200k

A 350 to 600 square foot unit added to the house, with its own entrance. Four to five months.

  • Foundation tied to the house
  • Studio or one bedroom
  • Kitchenette and full bathroom
  • Separate entrance and address
  • Fire-rated wall to the house
  • Utilities from the main house
Price my attached ADU

Two-bedroom ADU

$300kโ€“$450k

An 800 to 1,000 square foot detached home for a family or long-term tenant. Six to seven months.

  • Two bedrooms, one or two baths
  • Full kitchen and laundry
  • Separate electric and water meter
  • Covered porch or patio
  • Parking or driveway work if needed
  • Everything in Detached cottage
Price my two-bedroom ADU

Price your ADU in ten seconds

Choose the type of ADU, its size and the age of the main house. The range updates as you choose, using the same numbers our ADU supervisors quote from after a lot visit.

A range, not a quote. Your written estimate comes after the visit and does not change once you approve it.

Typical range for your answers$180,000 to $320,000

Turn this range into an ADU estimate

Where an ADU budget goes

The shell and the foundation take the biggest share. Utilities and fees are the lines people underestimate.

Averages from recent one-bedroom detached ADUs. The sewer, water and power lines, plus impact and permit fees, can reach a fifth of the budget, which is why a per-square-foot price alone is misleading.

Get my itemized ADU estimate
AI concept: Detached backyard cottage ADU beside an ADU attached to the side of a house
Detached on the left, attached on the right: the same unit, two ways to place it

Detached or attached ADU

Detached buys privacy for both homes. Attached costs less and shares more.

A detached ADU stands on its own in the yard with its own utilities. An attached ADU shares a wall, foundation work and often utilities with the house. At the lot visit we measure setbacks and utility runs and write down which one fits.

If this is trueWe recommend
You plan to rent it to someone outside the familyDetached
The backyard is shallow or steepAttached
You want both homes to feel fully privateDetached
Your budget is under $200,000Attached
The sewer line runs deep toward the backyardDetached
A parent should be a few steps from your kitchenAttached

How long an ADU takes

A detached ADU takes about five months to build. Design and permits come first.

Design, engineering and permits usually take two to five months, depending on your town. Construction takes four to seven months after that, and the certificate of occupancy closes the job.

ADU site plan drawn over a property survey

Months one to four

Zoning and plans

Zoning check, survey, floor plan, engineering and utility plans drawn and filed for permit.

AI concept: Foundation forms for a backyard ADU
AI-generated concept

Months four and five

Site and foundation

Trenches for sewer, water and power, footings poured, slab or crawlspace built and inspected.

AI concept: Framed backyard ADU with roof sheathing
AI-generated concept

Months five to seven

Shell and systems

Walls and roof framed, windows set, plumbing, wiring and heat pump roughed in and inspected.

AI concept: Finished ADU kitchen with a small dining table
AI-generated concept

Final month

Finish and occupancy

Insulation, drywall, kitchen, bath and floors, final inspections and the certificate of occupancy.

What we find once the ADU lot is surveyed

On four lots in ten, the sewer route sets where the ADU can go.

An ADU depends on things under the ground and in the town code. These are the conditions we find most often, each written into your estimate before the design is final.

38%

Sewer line too shallow for gravity flow

If the ADU sits lower than the main line, water cannot flow by gravity. We move the ADU, deepen the line or add a small grinder pump.

44%

Electrical panel with no spare capacity

A second home needs its own power. We upgrade the main panel or set a separate meter, depending on utility rules and rental plans.

16%

Survey shows a different lot line

Fences are often in the wrong place. The survey sets the real setbacks, and we adjust the footprint before plans are filed.

13%

Trees protected by the town

Large trees near the site may need a permit to remove or a root zone to protect. We plan around them and include any arborist report.

11%

Soil too soft for a standard footing

Clay or fill can shift. A soils report sets deeper or wider footings, priced before construction starts, not discovered later.

35%

Impact or connection fees

Some towns and utilities charge fees for a new unit. We list them in the estimate from the start, so the total is not a surprise.

What your ADU is built with

Every system in your ADU is named in the estimate, because a second home has to run on its own.

An ADU needs the same systems as a house, sized for a small space. We write down the brands and specs of each, so you can compare two ADU quotes by what is inside the walls, not only the square feet.

AI concept: Ductless heat pump in a small living room
AI-generated concept

Heat pump HVAC

A ducted or ductless heat pump from Mitsubishi or Daikin, sized for a small home and efficient enough to keep a tenant's bills low year-round.

AI concept: Heat pump water heater in a utility closet
AI-generated concept

Heat pump water heater

A tank from Rheem or A. O. Smith that heats water using about a third of the electricity of a standard tank, sized for one or two people.

AI concept: Fiber cement lap siding on a backyard cottage
AI-generated concept

Fiber cement siding

James Hardie siding in a color matched to the main house. It resists rot, fire and insects better than wood and needs little upkeep.

AI concept: Energy-rated windows on a new ADU
AI-generated concept

Windows and doors

Energy-rated vinyl or fiberglass windows from Andersen or Pella, with an entry door that locks separately from the main house.

AI concept: Luxury vinyl plank flooring in an ADU
AI-generated concept

Luxury vinyl plank

A waterproof floor that handles tenants, pets and spills, and looks like wood without the cost or the care that real wood needs.

AI concept: Compact ADU kitchen with apartment-size range
AI-generated concept

Compact kitchen

Apartment-size appliances from GE or Bosch, a 24-inch range and a full-height fridge, fitting a real kitchen into 10 to 14 feet of wall.

Written into every contract

Six promises you can hold us to.

Price lock

The approved price is the final price. Change orders only with your written approval.

On-time or we pay

A credit for every working day of delay we cause. Weather and inspections excepted, in writing.

Clean site, every day

Dust barriers, floor protection and a clean-up before we leave. Your home stays livable.

Daily update guarantee

A text or email every working day with photos and tomorrow's plan, or the day is free.

10-year warranty

Workmanship warranty in writing, transferable to the next owner, backed by a fixed address.

Milestone payments

A small deposit, then you pay only for work that is already completed, inspected and photographed.

Get my ADU estimate with these guarantees

Who builds your ADU

One project manager for the whole build, from zoning desk to final key.

An ADU involves the town, the utilities and a dozen trades. One project manager coordinates all of them and is the only number you need. Everyone on site is background-checked and introduced by name.

ADU project manager

ADU project manager

Handles zoning, permits, utilities and your weekly update.

Site superintendent

Site superintendent

Runs the crew on site every day from footing to final.

Lead carpenter

Lead carpenter

Frames the ADU, sets windows and builds the finish work.

Illustrative project scopes

ADU construction: scope and budget examples.

Planning examples with illustrative budgets and durations. These are not completed customer jobs, invoices or promises about your project.

AI concept: Detached 1-bed cottage
AI-generated concept

Detached 1-bed cottage

Example budget
$236,400
Example duration
5 months
Record type
Illustrative scope
AI concept: Attached studio ADU
AI-generated concept

Attached studio ADU

Example budget
$148,900
Example duration
4 months
Record type
Illustrative scope
AI concept: Detached 2-bed ADU
AI-generated concept

Detached 2-bed ADU

Example budget
$372,000
Example duration
7 months
Record type
Illustrative scope

Your lot is not average

Every lot has its own rules. Here is how yours changes the ADU price.

ADU estimates start from the three tiers above, then move for your lot, your utilities and who will live in the unit. Find the case closest to yours.

Built for rental income

Tenants expect a separate meter, a private entrance and a quiet shared wall or yard. We plan the unit around what renters in your area pay for and give you the cost, so you can weigh the build against rent.

Price a rental ADU for my lot

A parent or adult child

An ADU for family can share utilities and skip a separate meter, which lowers the price noticeably. We add wide doors, a step-free entry and a curbless shower, so the unit still works if needs change later.

Price an ADU for my family

Strict zoning or HOA

Setbacks, height limits, parking rules and HOA covenants decide what can be built. We read them before we draw, file with the town under our license and prepare the drawings your HOA board needs to vote.

Check my zoning for an ADU

Septic system or well

A septic system may need to be enlarged for a second home, and a well may need a flow test. We order those checks first, because on a rural lot they can change the budget more than anything else we price.

Price an ADU on septic or well

A careful budget

A simple rectangle, a slab foundation, a shared utility connection and a studio floor plan can bring a detached ADU near $150,000. We show you which savings keep the unit comfortable and rentable for years.

Get my budget ADU estimate

A larger two-bedroom

Two bedrooms and a laundry make the ADU a real family home, and often allow a higher rent. The added size moves the price mostly through framing and finishes, since the utility work stays nearly the same.

Price a two-bedroom ADU

Low energy bills

A tight shell, heat pump heating and hot water and solar-ready wiring can keep monthly bills very low. We price each upgrade on its own line and tell you honestly which ones pay back fastest in your climate.

Price an energy-efficient ADU

A historic district

In historic districts the ADU often has to match the main house in roof pitch, siding and windows. We prepare drawings for the review board and use materials that match, which adds time more than cost.

Price an ADU in a historic district

What this service is

ADU construction, defined the way we build it.

ADU construction is the design and building of an accessory dwelling unit: a complete, independent home with its own kitchen, bathroom, sleeping area and entrance, on the same lot as a main house, either detached or attached to it. ProBuild Remodeling builds ADUs as a licensed general contractor, handling zoning, permits, utilities and construction under one contract.

The service covers the zoning check, survey coordination, design and engineering, permits and fees, foundation, sewer, water and electrical connections, framing, roofing, windows, heating and cooling, kitchen, bathroom, finishes and final inspections. It does not include converting an existing garage or finishing rooms inside the house, which have their own pages and prices.

It is for homeowners who want rental income, a home for a parent or adult child, or a long-term guest house, and who have a lot where local rules allow a second unit. It is not for lots where zoning prohibits ADUs, or for owners looking for a quick, low-cost backyard office.

ADU words on your estimate

ADU
Accessory dwelling unit. A second, complete home on a single-family lot, with its own kitchen, bath and entrance.
Setback
The minimum distance a building must keep from the property lines. It sets where on the lot the ADU can go.
Site plan
A drawing of the lot showing the house, the ADU, setbacks and utility routes. Filed with the permit.
Impact fee
A one-time fee some towns charge for a new unit, to pay for schools, parks or roads. Listed in your estimate.
Separate meter
An electric or water meter just for the ADU, so a tenant pays their own bills. Required by some utilities.
Lateral
The pipe that carries sewage from a building to the main sewer line. The ADU usually ties into the house lateral.
Fire separation
Rated walls and ceilings between an attached ADU and the house that slow a fire from spreading between them.
Certificate of occupancy
The document from the town that says the ADU passed every inspection and can legally be lived in.

ADU questions

Eight ADU questions we answer on every lot visit.

How much does it cost to build an ADU?

An attached ADU of 350 to 600 square feet costs about $110,000 to $200,000. A detached one-bedroom cottage runs $180,000 to $320,000, and a two-bedroom detached ADU $300,000 to $450,000. Utility runs, fees and the foundation move the price most from lot to lot.

Can I build an ADU on my property?

It depends on your zoning. Many states and towns now allow at least one ADU on a single-family lot, but each sets its own limits on size, setbacks, height and parking. We look up your address before the first visit and tell you what applies.

How long does it take to build an ADU?

Design and permits usually take two to five months, depending on how busy your town is. Construction takes four to seven months after that. Most detached one-bedroom ADUs are finished about seven to ten months after the first meeting.

Does an ADU need its own utilities?

It needs water, sewer and power, but not always separate meters. A family ADU can often share the main house connections. A rental ADU usually works better with its own electric meter so the tenant pays directly. Local utility rules decide.

Can I rent out my ADU?

In most places yes, as a long-term rental. Some towns require the owner to live on the property or restrict short-term rentals. We check your local rules before design, so the unit you build can be used the way you plan.

How big can an ADU be?

Many towns cap detached ADUs between 600 and 1,200 square feet, or at a share of the main house size. Attached ADUs are often limited to half of the main house. Your zoning sets the exact number, and we design within it.

Is a prefab ADU cheaper than a site-built one?

The unit itself can cost less, but the foundation, crane, utilities, permits and finishing are still needed and often not included. Once those are added, totals are usually close. We are happy to compare a prefab quote line by line.

Will an ADU raise my property taxes?

Usually yes, because it adds value to the property. The increase depends on your county and is based on the added value, not the whole property. We suggest a quick call to your assessor before you build.

ADU builders near you

Your remodeling address, within our service area.

ADUs are built by local crews under the license of your state, with permits filed in your town. Zoning rules differ by town, so every lot is checked first.

  • Maine
  • New Hampshire
  • Massachusetts
  • Rhode Island
  • Connecticut
  • New York
  • New Jersey
  • Pennsylvania
  • Delaware
  • Maryland
  • Virginia
  • North Carolina
  • South Carolina
  • Georgia
  • Florida
  • Check your remodeling address

Free ADU lot check

Send your answers and your address. Find out what your lot allows before you spend on plans.

An ADU supervisor reads your answers, checks your zoning, texts you within five minutes on business days and sets the lot visit.

Text my quote Call now

Images marked as AI concepts illustrate remodeling ideas, materials and conditions. They are not photographs of completed ProBuild projects or verified before-and-after pairs.

Your remodeling question

Discuss ADU construction

Tell us what you want to change. Request a call or estimate; preferred visit times are confirmed separately.

Pre-book a visit (optional)

A supervisor confirms the slot by phone or text before it is booked.

Before your next decision

Still comparing your remodeling options?

Review the questions that make estimates easier to compare, or ask about your own project when you are ready.