Tenant improvement · Licensed & insured · Landlord approvals handled

Tenant improvement build-outs priced against your allowance
and done before rent starts.

For tenants moving into leased space and landlords preparing a vacant suite. We read the lease work letter, price the build-out against the TI allowance, get landlord and city approvals, and finish on a date tied to your lease. Budget pricing within 48 hours of the walkthrough.

Text the suite address, the square footage and the lease start date. A TI project manager replies within 5 minutes during business hours.

  • $40–$90Per sq ft, build-out
  • 4–8 wksTypical build-out
  • 4.9410 reviews
  • 48hBudget pricing

What happens after you text us

A TI project manager asks for the lease dates, because they set the whole schedule.

Send the suite address, the size and the rent start date. The project manager asks for the work letter or the TI allowance, whether the landlord has building standards, and books a walkthrough, often before the lease is signed.

  • Budget pricing before you sign helps you negotiate the allowance
  • The work letter tells us who pays for what and what needs approval
  • The schedule is built backward from the rent start date
Text me my quote

What a tenant build-out costs

A tenant improvement costs $10,000 to $450,000. The condition of the suite sets the tier.

For a 2,000 to 5,000 square foot office with a previous tenant's layout, most build-outs land in the Standard tier. Our budget pricing lines up with the TI allowance, so you see early what the landlord covers and what you pay.

Cosmetic turnover

$10k–$40k

Same layout, new finishes for the next tenant. One to three weeks. About $5 to $20 per sq ft.

  • Paint and patch throughout
  • Carpet tile or LVT
  • Ceiling tiles replaced
  • LED fixtures swapped
  • Door hardware and signage
  • Clean and ready for move-in
Get my turnover budget

Shell build-out

$180k–$450k+

An empty shell made ready to occupy. Eight to sixteen weeks. About $90 to $200+ per sq ft.

  • Everything in Standard build-out
  • Restrooms built to ADA
  • HVAC ducts and zoning
  • Ceilings, lighting, sprinklers
  • Electrical service and panels
  • Certificate of occupancy
Get my shell build-out budget

Estimate your build-out

Pick the build-out type, the suite size and the age of the building. The range updates with each pick, so you can compare it with the TI allowance the landlord is offering.

A range, not a quote. Your written estimate comes after the visit and does not change once you approve it.

Typical range for your answers$40,000 to $180,000

Turn this range into budget pricing

Where the money goes

Walls, ceilings and wiring take almost half. Finishes are a smaller share than tenants expect.

Averages from our recent standard office build-outs. Reusing a previous tenant's walls and ceilings is the biggest single way to stretch a TI allowance, which is why we check what can stay before we draw anything new.

Get my itemized build-out budget
AI concept: Office floor plan with existing walls kept in gray and new walls drawn in blue
Existing walls kept in gray, new walls in blue: the fewer blue lines, the lower the cost

Reuse the old layout or rebuild

Reuse the previous layout when it is close. Rebuild it when the rooms fight the way you work.

A second-generation suite already has walls, ceilings, lights and HVAC in place. Keeping them can cut a build-out by a third or more. These six rules help decide how much of the old space to keep.

If this is trueWe suggest
Most rooms are close to the sizes you needReuse layout
You need open space where there are many officesRebuild layout
Ceilings and lights are in good shapeReuse layout
Restrooms fail accessibility rulesRebuild layout
Your allowance is under $30 per sq ftReuse layout
The use changes, like office to medicalRebuild layout

How long it takes

A standard build-out takes four to eight weeks, planned backward from your rent start date.

Drawings, landlord approval and permits usually take three to eight weeks before construction. Starting before the lease is signed is the best way to protect a move-in date.

AI concept: Project manager walking an empty office suite
AI-generated concept

Before signing

Walkthrough and budget

We walk the suite, read the work letter and send budget pricing so you can negotiate the allowance.

AI concept: A natural close photograph of a remodeling planning worktable for tenant improvement with appropriate unmarked material samples, pencil, tape measure and a completely blank closed folder. No drawings or paper with markings
AI-generated concept

After signing

Drawings and approvals

Space plan, landlord approval and permit filing, with the landlord's insurance papers delivered.

AI concept: Crew framing new offices in a leased suite
AI-generated concept

Construction weeks

Build and inspect

Walls, wiring, HVAC and finishes go in after hours where other tenants are nearby.

AI concept: Finished office suite ready for a tenant
AI-generated concept

Move-in week

Final and handover

Final inspections, occupancy sign-off, a punch list walk and keys handed over for move-in.

What we find in leased suites

In four of ten build-outs, the sprinkler heads have to move for new walls.

These are the six conditions we find most often when building out leased space. Each one is priced during budgeting and marked as landlord or tenant cost based on the lease, so nothing surprises either side.

44%

Sprinkler heads in the way of new walls

Every new room needs coverage. A licensed fire sprinkler contractor moves or adds heads and the fire marshal signs off.

38%

HVAC that does not suit the new rooms

Closed offices get too hot or cold. We add zones or rebalance ducts so every room holds temperature.

31%

Old cabling left above the ceiling

Previous tenants leave data and phone cable behind. We remove what code requires and run new data where you need it.

27%

Restrooms that fail accessibility rules

Shared or suite restrooms may need wider doors or grab bars. The lease decides who pays; we price it either way.

22%

Building standards missing from the lease

Many landlords require set doors, ceilings or lights. We get the standards in writing before drawings start.

16%

Electrical service too small for the use

Medical, salon or kitchen equipment needs more power. We size the service early and check it with the landlord.

What your suite is built with

Building-standard materials, named in the budget, so the landlord approves them once.

Landlords often require specific doors, ceilings and lights so every suite in the building matches. We confirm the building standard first, then name each product so tenant and landlord see the same list.

AI concept: Prefinished steel door frame on a new office
AI-generated concept

Prefinished door frames

Timely prefinished steel frames install fast and look clean without painting, a common building standard in office buildings.

AI concept: Suspended ceiling grid with acoustic tiles
AI-generated concept

Ceiling grid and tile

USG or Armstrong grid with acoustic tile keeps sound down and gives easy access to ducts, sprinklers and cables above.

AI concept: Carpet tile being laid in an office
AI-generated concept

Carpet tile

Mohawk Group or Interface carpet tile, laid in squares so a stained tile can be swapped without replacing the floor.

AI concept: LED troffer lights in an office ceiling
AI-generated concept

LED troffers

Cooper Lighting Metalux LED fixtures that drop into the ceiling grid, often eligible for utility rebates in many areas.

AI concept: Mineral wool insulation in a steel stud wall
AI-generated concept

Sound insulation

Rockwool Safe'n'Sound batts inside office and conference room walls, so private conversations stay inside the room they belong in.

AI concept: Glass office fronts along a corridor
AI-generated concept

Glass office fronts

Aluminum-framed glass walls and doors that carry daylight deep into the suite while still keeping each office acoustically private.

Written into every contract

Six promises you can hold us to.

Price lock

The approved price is the final price. Change orders only with your written approval.

On-time or we pay

A credit for every working day of delay we cause. Weather and inspections excepted, in writing.

Clean site, every day

Dust barriers, floor protection and a clean-up before we leave. Your home stays livable.

Daily update guarantee

A text or email every working day with photos and tomorrow's plan, or the day is free.

10-year warranty

Workmanship warranty in writing, transferable to the next owner, backed by a fixed address.

Milestone payments

A small deposit, then you pay only for work that is already completed, inspected and photographed.

Get my build-out budget with these guarantees

Who runs your build-out

One TI project manager for tenant and landlord, so nobody passes messages back and forth.

Build-outs involve a tenant, a landlord, a property manager and a city. You get one named project manager who talks to all of them, plus a superintendent on site, both background-checked.

TI project manager

TI project manager

Reads the lease, prices against the allowance and runs approvals.

Site superintendent

Site superintendent

Runs crews in occupied buildings and keeps other tenants happy.

Estimator

Estimator

Splits every cost into landlord and tenant lines per the work letter.

Illustrative project scopes

Tenant improvement: scope and budget examples.

Planning examples with illustrative budgets and durations. These are not completed customer jobs, invoices or promises about your project.

AI concept: An empty professional conference room with a wood table, plain walls and no wall signs
AI-generated concept

Law office, 3,200 sq ft

Example budget
$168,000
Example duration
9 weeks
Record type
Illustrative scope
AI concept: Office turnover, second-gen
AI-generated concept

Office turnover, second-gen

Example budget
$28,400
Example duration
2 weeks
Record type
Illustrative scope
AI concept: Dental suite from shell
AI-generated concept

Dental suite from shell

Example budget
$386,000
Example duration
15 weeks
Record type
Illustrative scope

Your lease is not average

Your lease and space are different. Here is how the build-out changes for them.

Every build-out follows the same steps from walkthrough to keys, then shifts with the lease, the building and the business moving in. Pick the case closest to yours.

Negotiating the TI allowance

The best time to price a build-out is before the lease is signed. Our budget shows the real cost per square foot for your layout, so you can ask for a larger allowance or free rent with numbers the landlord can check.

Price my build-out before I sign

Allowance short of the plan

When the budget runs past the allowance, we show where reusing walls, lights or ceilings closes the gap and which changes the business can live without, all before you pay a single dollar out of your own pocket.

Fit my build-out to the allowance

Landlord with a vacant suite

Owners often build a spec suite or refresh a space between tenants. We keep to your building standard and a set cost per square foot, and finish fast so the listing photos show a space ready to lease.

Get my vacant suite turnover budget

A new office for your team

Private offices, a conference room, a break room and data to every desk. We plan for the headcount you expect in two or three years, so you are not paying to move walls again before the lease is even half over.

Plan my office build-out

Medical, dental or salon use

These uses need more plumbing, more power and often special ventilation and ADA rooms. We confirm the building can support them before you sign, since a missing drain or a small electrical service is costly to fix later.

Check my medical or salon build-out

Rent starts on a fixed date

Many leases give a set number of free months to build. We file drawings and order long-lead items like glass fronts and HVAC parts first, and send weekly written updates you can forward straight to the landlord.

Plan my build-out to the rent date

Moving in while work continues

Some tenants need to open part of the suite before the rest is done. We phase the work so the first area gets its inspection and occupancy approval while the rest is still being built behind temporary walls.

Phase my build-out and move-in

A change of use

Turning a retail unit into a studio, or an office into a clinic, can bring new rules for exits, restrooms and parking. We check zoning and the building code before the lease is signed, so the use is approved.

Check the use before I sign the lease

What this service is

Tenant improvement, defined the way we build it.

Tenant improvement is the construction work that adapts a leased commercial space to the needs of a specific tenant, such as new walls, offices, restrooms, lighting, data, HVAC changes and finishes, usually paid in part by a landlord's tenant improvement allowance. It is also called a build-out or TI. ProBuild Remodeling performs it as a licensed general contractor for tenants and landlords.

The service covers walkthroughs, budget pricing before the lease is signed, space plans and permit drawings, landlord approvals, construction in occupied buildings, inspections, the certificate of occupancy and splitting costs between landlord and tenant by the work letter. It does not include furniture, moving or the tenant's own equipment. Remodeling a building you own and occupy is priced on the commercial remodeling page.

It is for small businesses leasing office, retail, medical or salon space, landlords preparing vacant suites, and brokers who need budget pricing for a client. It is not for large multi-floor corporate headquarters or for ground-up buildings.

The words you will see in a build-out budget

TI allowance
Money the landlord agrees to spend on your build-out, usually stated as dollars per square foot in the lease.
Work letter
The part of the lease that says what work is done, who approves it and who pays for which costs.
Shell space
A suite with no finished walls, ceilings or restrooms, sometimes called cold dark shell. It costs the most.
Second-generation space
A suite already built out by a previous tenant. Reusing its walls and ceilings stretches the allowance.
Building standard
The doors, ceilings, lights and finishes a landlord requires in every suite so the building stays consistent.
Rent commencement
The date rent starts. Build-outs are scheduled backward from it so the tenant is not paying for empty space.
Turnkey build-out
A deal where the landlord delivers a finished suite to agreed plans and pays the full construction cost.
Certificate of occupancy
The approval that lets the tenant move in and open, issued after final inspections on the build-out.

Questions tenants and landlords ask

The eight build-out questions we hear before a lease is signed.

What is a tenant improvement allowance?

It is the amount a landlord agrees to pay toward building out your space, usually stated in dollars per square foot, such as $30 to $60 per foot for office space. Costs above the allowance are usually paid by the tenant, which is why pricing before signing matters.

How much does a tenant build-out cost per square foot?

A cosmetic turnover of a second-generation suite runs about $5 to $20 per square foot. A standard office build-out is typically $40 to $90, and building out an empty shell, especially for medical or restaurant use, $90 to $200 or more.

Who pays for tenant improvements, the landlord or the tenant?

The lease decides. Often the landlord pays up to the TI allowance and the tenant pays the rest, or the landlord delivers a turnkey suite. We split every line of the budget into landlord and tenant costs according to the work letter.

How long does a tenant improvement project take?

A cosmetic turnover takes one to three weeks. A standard build-out takes four to eight weeks of construction after three to eight weeks of drawings, landlord approval and permits. A shell build-out can take eight to sixteen weeks.

Can the build-out start before the lease is signed?

Walkthroughs, budget pricing and even early drawings can, and should, happen before signing. Construction usually waits for a signed lease and landlord approval of the plans, plus the permit.

What is the difference between a shell space and a second-generation space?

A shell has bare walls, open ceilings and often no restrooms, so everything is built new. A second-generation space was built out by a previous tenant, so walls, ceilings, lights and HVAC can often be reused, which lowers the cost.

What happens to the improvements when the lease ends?

Most improvements stay with the building and belong to the landlord. Some leases require the tenant to remove specialty items or restore the space. We note restoration clauses during budgeting so they do not surprise you later.

Does a landlord have to approve my contractor?

Many landlords require approval of the contractor and proof of insurance naming them and the property manager. We send our license, insurance certificates and references to the landlord before the walkthrough.

Tenant improvement near you

Your remodeling address, within our service area.

Build-outs are run by local project managers licensed in your state, with permits filed at your city and license numbers listed state by state.

  • Maine
  • New Hampshire
  • Massachusetts
  • Rhode Island
  • Connecticut
  • New York
  • New Jersey
  • Pennsylvania
  • Delaware
  • Maryland
  • Virginia
  • North Carolina
  • South Carolina
  • Georgia
  • Florida
  • Check your remodeling address

Free build-out budget

Send your answers now. Get budget pricing before you sign the lease.

A TI project manager reads your answers, replies within 5 minutes during business hours and books the walkthrough, early morning or after hours if the building is occupied.

Text my quote Call now

Images marked as AI concepts illustrate remodeling ideas, materials and conditions. They are not photographs of completed ProBuild projects or verified before-and-after pairs.

Your remodeling question

Discuss Tenant improvement

Tell us what you want to change. Request a call or estimate; preferred visit times are confirmed separately.

Pre-book a visit (optional)

A supervisor confirms the slot by phone or text before it is booked.

Before your next decision

Still comparing your remodeling options?

Review the questions that make estimates easier to compare, or ask about your own project when you are ready.